新聞中心
新聞資訊
聯(lián)系我們
山東途暢路橋工程有限公司
聯(lián)系人:石總
電話:18264104888
地址:山東省濟(jì)南市槐蔭區(qū)經(jīng)一路273號(hào)群盛華城
冷再生機(jī)路面養(yǎng)護(hù)中的接縫問(wèn)題處理
來(lái)源:http://www.hlbeyb.com/ 日期:2023-02-10 發(fā)布人:
冷再生機(jī)在工作過(guò)程中,每次停車(chē),即使只需要幾分鐘就可以更換罐車(chē),也會(huì)對(duì)整個(gè)接縫處回收材料的均勻性造成嚴(yán)重影響。因此,冷再生機(jī)租賃廠家提醒,在施工中應(yīng)盡量減少停工。在不可避免的情況下,應(yīng)仔細(xì)處理形成的橫向接縫。
During the working process of the cold regenerator, even if the tank car can be replaced within a few minutes after each stop, it will also have a serious impact on the uniformity of the recycled material at the entire joint. Therefore, the cold regenerator leasing manufacturer reminded that shutdown should be minimized during construction. Where unavoidable, the transverse joints formed shall be carefully treated.
1。當(dāng)臨時(shí)停工后重新開(kāi)工時(shí),整個(gè)再生裝置應(yīng)后退1.5-2米再生材料,以確保所有材料在開(kāi)工后得到處理。
1。 When restarting after temporary shutdown, the whole regeneration device shall be retreated 1.5-2 meters to the recycled material to ensure that all materials are treated after starting.
2。后一個(gè)工段應(yīng)預(yù)留4-6米的實(shí)時(shí)壓路,下一工段不碾壓。
2。 4-6 meters of real-time rolling shall be reserved for the next section, and the next section shall not be rolled.
3。當(dāng)冷再生租賃后開(kāi)始工作時(shí),應(yīng)將轉(zhuǎn)子切割到再生層的底部,以破壞再生材料。前進(jìn)速度為0,使松散再生料混合不均勻。因此,人工翻身后須對(duì)坑進(jìn)行平整。
3。 When starting work after the cold regeneration lease, the rotor should be cut to the bottom of the regeneration layer to destroy the regeneration material. The forward speed is 0, so that the loose recycled material is mixed unevenly. Therefore, the pit must be leveled after manual turnover.


再生層穩(wěn)定后,再生料基本處于穩(wěn)定狀態(tài),但不能完全再生機(jī)輪軌。此時(shí)輪距深度約為0.5-1厘米。
After the regeneration layer is stabilized, the recycled material is basically in a stable state, but the wheel rail of the regeneration machine cannot be completely eliminated. At this time, the track depth is about 0.5-1 cm.
當(dāng)兩段再生完成且全部穩(wěn)定后,用平地機(jī)進(jìn)行平整。一次調(diào)平的目的是一和二塊右側(cè)的三排輪軌。二次平整主要是在刮料機(jī)前均勻攤鋪再生料,同時(shí)考慮再生層的水平和垂直坡度。后對(duì)整個(gè)作業(yè)段進(jìn)行平整。
When the two stages of regeneration are completed and all are stable, use a grader to level them. The purpose of primary leveling is to eliminate one and two right three-row wheel tracks. The secondary leveling is mainly to evenly spread the recycled material in front of the scraper, taking into account the horizontal and vertical slope of the recycled layer. After that, the whole operation section shall be leveled.
再生機(jī)的工作寬度一般小于再生路面的工作寬度。因此,整個(gè)道路的再生需要多次操作,導(dǎo)致幾個(gè)相鄰工作面之間出現(xiàn)縱向接縫。
The working width of the regenerator is generally smaller than the working width of the recycled pavement. Therefore, the regeneration of the entire road requires multiple operations, resulting in longitudinal joints between several adjacent working faces.
一般來(lái)說(shuō),相鄰工作面之間的小重疊為10cm,以確保縱向接縫處回收材料的連續(xù)性,同時(shí)避免相鄰工作面之間存在不回收的夾帶。
Generally speaking, the small overlap between adjacent working faces is 10cm to ensure the continuity of recycled materials at the longitudinal joints and to avoid non-recycled entrainment between adjacent working faces.
另外,在選擇冷再生機(jī)的時(shí)候,要與冷再生租賃廠家簽訂相應(yīng)的合同,這一點(diǎn)是非常重要的。您要注意一下合同的雙方,甲方與乙方都應(yīng)該是明確的租賃人,應(yīng)該明確雙方的責(zé)任和義務(wù)。更多相關(guān)該設(shè)備租賃的事項(xiàng)就來(lái)我們網(wǎng)站做http://www.hlbeyb.com咨詢吧!
In addition, when selecting the cold regeneration machine, it is very important to sign the corresponding contract with the cold regeneration leasing manufacturer. You should pay attention to both parties of the contract. Both Party A and Party B should be clear tenants, and the responsibilities and obligations of both parties should be clear. Come to our website for more matters related to the equipment leasing http://www.hlbeyb.com Ask!
閱讀/ Recommended reading
- 冷再生機(jī)租賃的市場(chǎng)優(yōu)勢(shì)與設(shè)備選型 2026-06-04
- 水泥撒布車(chē)出租:車(chē)況是路面施工質(zhì)量的生命線 2026-05-26
- 水泥撒布車(chē)出租:租對(duì)車(chē)工程效率才能翻倍 2026-05-28
- 冷再生機(jī)如何做到“修路不堵路”? 2026-05-26
冷再生機(jī)租賃合同規(guī)范與現(xiàn)場(chǎng)運(yùn)維要點(diǎn)
[2026-06-01]
冷再生機(jī)的順利運(yùn)轉(zhuǎn)不僅依賴于的設(shè)備,更離不開(kāi)嚴(yán)謹(jǐn)?shù)暮贤s束與規(guī)范的現(xiàn)場(chǎng)管理。在簽訂租賃合同時(shí),雙方必須明確各項(xiàng)權(quán)責(zé)邊界。通常情況下,出租方需保證設(shè)備狀況良好、證照齊全,并配備...







